metal roof rake cut-back

13K views 6 replies 2 participants last post by  hotrodo351  
#1 ·
i have my first metal roof installed and it time to install the rakes and ridge. i have a video that shows cutting a angle on the beginning of the rake but doesn't say how much, 2" im guessing.
 

Attachments

#4 ·
well all my panels are installed. i just flipped the evaporator cooler back into position and now realize that the ridge metal is going to sit to high for the cooler to clear it. the rear of the unit sits right at the peak. it cleared the original shingle roof with no problem, but the metal ridge cap sit higher. look like the unit has to go up about 4". this also means that the duct inside that connects it will have to be extended. this is all no big huge project but im wondering if i should go back to the home owner and ask for a adjustment to the contract for this extra work or just go ahead and do it and learn what to look for on the next job so as to prevent this form causing work for me that i dont get paid for.
 
#5 ·
got lucky, ridge metal clears the swamp cooler. the ridge sits lower than i expected. finally done. been screwing 5 hours a day for 5 days. thought id never stop screwing. so all and all ive got 30 hours into doing a 2300 square foot roof, straight gable, up and over. but now ive got a feeling for whats involved. can see where a hip and valley would be more, and winds would really be a problem. but not really that bad to do. took longer than if it were shingles. not as hard, physically, than doing shingles. so i would do another, but think id add a little to the price for the extra time it takes.