I'm doing a closed valley on our roof however, the way the roof is framed, there is a 1" height gap between the two roofs of the valley (a dormer and a porch). The way this was originally fixed when the roof had shakes was they ran a 14" wide piece of flashing to cover the gap and create a flat floor for the shingles in the valley to go over. I'm going to do the same thing however what was there was 26ga galvanized which I can't find locally quickly (working on the valley on Monday). I can get 30ga however - would there be any problem just running a double thick layer of it? The flashing isn't seen - it's just to level the transition.