Roofing Talk - Professional Roofing Contractors Forum banner
1 - 1 of 1 Posts

· Registered
Joined
·
1 Posts
Discussion Starter · #1 ·
Hello all
Im replacing ridge tiles and purchased Seeleys Point works. I know i have to "bed" the caps on the ridge/hip butcan I use the repointing compound where the ridge tiles overlap without putting morter first. The Seeleys say the thickness of the compound should be 3 to 5 mm thick but the overlap would be maybe 20 to 30mm at the thickest point. Any help would be great.
Thanks in advance
Darren
 
1 - 1 of 1 Posts
Top