Hello all
Im replacing ridge tiles and purchased Seeleys Point works. I know i have to "bed" the caps on the ridge/hip butcan I use the repointing compound where the ridge tiles overlap without putting morter first. The Seeleys say the thickness of the compound should be 3 to 5 mm thick but the overlap would be maybe 20 to 30mm at the thickest point. Any help would be great.
Thanks in advance
Darren
Im replacing ridge tiles and purchased Seeleys Point works. I know i have to "bed" the caps on the ridge/hip butcan I use the repointing compound where the ridge tiles overlap without putting morter first. The Seeleys say the thickness of the compound should be 3 to 5 mm thick but the overlap would be maybe 20 to 30mm at the thickest point. Any help would be great.
Thanks in advance
Darren