I have had to do that on commercial buildings before, but a bobcat and a jack hammer were a necessity to proceed with any degree of progress. But, there was also a concrete span deck under the top layer of concrete, not a plywood deck.

Geez, how the heck did that not collapse?

Ed
 

·
Registered
Joined
·
54 Posts
Discussion Starter · #3 ·
I suppose lightweight concrete? The deck is 1" X 12" planks over typical joists. Looking over at the next door neighbors I see the same thing. Chop sawn into small pieces and brute force got this one done. H.O. approved the change order $$$.
 